July 28, 2014

Fusion Tanks & Silos are renowned and valued for their modular design and associated rapid erection times.  FUSION® Tanks and Silos can be installed in less than 50% of the time of comparable concrete tanks.

A recent example of the FUSION® Modular Bolted Tank Construction which successfully highlights the very rapid installation times of the FUSION® Glass-Fused-to-Steel solution are the two drinking water tanks (pictured above), each with a capacity of 3177m3 (839,275 USG).  These were shipped to Limmasol Port in Cyprus and then installed utilising the experience of a Fusion Service Engineer and the FUSION® jacking system in a total build time of only 37 days!

The FUSION® jacking system allows build work to be carried out at ground level, giving build time benefits and crew safety benefits.

So do not delay, contact the Fusion Sales Team today to discuss your next rapid build Glass-Fused-to-Steel Containment Solution!